国内精品一区二区三区香蕉,精品一二三区久久AAA片,国产精品一区久久一区,302黄大片一区二区三区,强奸乱伦一区,国产一区二区三区任你鲁,天天插天天射天天日,波多野结衣一区二区,92久久偷偷做嫩草影院免费看

Two DATUM? compressor trains destined for BP’s Mad Dog 2 project in Gulf of Mexi

December 12, 2017
   Two compressor trains ordered for BP’s Mad Dog 2 project.
 
  The Dresser-Rand business will supply two low-pressure D6A4S DATUM compressors and two high-pressure D6R9B DATUM compressors for export gas service for BP’s Mad Dog 2 project in the deepwater Gulf of Mexico. The modular design of the DATUM compressor minimizes maintenance and reduces downtime.
 

 
  Each compressor train will be driven by a Siemens electric motor and includes a variable speed gearbox. The equipment is scheduled to ship in 2018, with oil production expected to begin late in 2021. Dresser-Rand has been a strategic supplier to BP since 2000 and supplied equipment for several of BP’s projects in the Gulf, including Mad Dog (Phase I), Thunder Horse, and Atlantis. The Dresser-Rand business has delivered nearly 50 compressors to BP worldwide over the years, with approximately half of these installed in the Gulf of Mexico.